The shipping terminal on two independent lines allows you to receive grains and oilseeds, and in the same way make shipments.
- Reception of grain from vehicles - up to 4000 tons per shift
- 2.5 km of own loading and unloading railway tracks
- Loading - up to 60 wagons in a 10-hour shift
- Delivery and acceptance of goods is carried out at the places of loading (exhibition track up to 70 wagons)
- Availability of a rented locomotive with access to public tracks
- The drying complex is not provided for by the project, it is equipped with an underworking system (2 TAS-206A6 separators from Buhler with a capacity of 400 tons/hour)
In July 2019, the loading terminal began to work on departure route railway shipments. The first route was 50 wagons, which today is the largest in terms of grain volume among the largest shippers.