Construction of the terminal began in 2004. In August 2007, a trial transshipment of grain crops was carried out. The terminal was commissioned in May 2008. The terminal is equipped with high-speed, high-performance equipment. LLC "NZT" uses a modern process control system and the oil dust suppression method.
Сайт