As part of the implementation of the 180-hectare industrial hop farm project, 160 hectares of Krasnodar hop farms have been rebuilt, with trellises and anchors installed, wires stretched, soil prepared for planting, and irrigation system built.
As part of the implementation of the 180-hectare industrial hop farm project, 160 hectares of Krasnodar hop farms have been rebuilt, with trellises and anchors installed, wires stretched, soil prepared for planting, and irrigation system built. European equipment, as well as specialized equipment for seedling sowing, plant protection, and harvesting up to 2000 vines, was purchased.
The design capacity of the hop farm is up to 400 tons of hops per year. The production includes a full cycle of hop processing: from cultivation to packaging and vacuuming.